XRANM

XRANM is a new 34,057 sq ft multiple-use medical facility to include Mammo, XRAY, CT, MRI, Exam Rooms Offices, Business Area and Waiting Areas. The facility was designed to be visually pleasing with special attention to fixtures, casework, art and finishes. The mechanical system was designed to have redundant systems to provide back up for critical equipment. The project was broken into foundation, shell and TI in efforts to get project procured early while final design of shell and TI was in process. Two separate architects worked on the shell and TI as a collaboration to meet both developer and end user needs. The project was developed and completed 05/11/23 in 14 months to meet milestones of grand opening. Challenges included delay of electrical and mechanical equipment. Enterprise Builders help overcome challenges by substituting mechanical Chiller and AHU manufacturers that could meet project critical path dates. In addition, Enterprise Builders with collaboration of the project team overcame delay in manufacturing of electrical gear by providing smaller temporary panels as temporary measures until the larger specified panels arrived. Preconstruction services was critical for the project to help identify valued savings in cost and time such as the large area of metal panels. Enterprise Builders assisted in finding the panels that fit the clients need for look and colors. We assisted in selecting mechanical equipment that could meet project milestones. Early procurement of underground utilities allowed construction to start on time.

Presbyterian Robert Wertheim Hospice House

Presbyterian Robert Wertheim Hospice House is a residentially inspired and fully licensed hospice care facility situated in northeast Albuquerque at Presbyterian’s Northside Campus. This 7,700-sf home has 10 resident rooms, each featuring a private patio with views looking toward the Sandia Mountains.

Presbyterian Hospital SE Parking Garage

Presbyterian Healthcare Services downtown hospital campus has always had constraints with available parking. As the demand continued to grow for parking, PHS decided to build a new 3 story parking garage that took the place of a outdoor parking lot. The 3 story parking garage provided enough parking to fit 1,200 vehicles. The site was challenging from a logistical standpoint because the footprint of the building encompassed the entire parking lot and Enterprise Builders Corporation had to build right near the limits of construction with a busy campus right adjacent to our construction site. In addition the initial site had to be cut over 20’ on the south half of the footprint and led to an export of approximately 60,000 cubic yards of soil. As if the tight site constraints were not enough to deal with, the project started at the height of the global Covid 19 pandemic. Due to Covid outbreaks the precast concrete supplier had to close their plant multiple times due to outbreaks. This caused a delay in delivering the precast concrete, however, Enterprise Builders Corporation was proactive in assisting the precast concrete supplier with additional labor to help get the project back on track.

Academy Dental

New dental care office comprised of 4,987 sq ft with wood and metal stud framing building. It consists of smooth stucco, metal panels, T&G wood, and resawn wood accents, high end floor finishes, and detailed casework. Large storefront and curtain walls give the building a distinct architectural design. Landscaping and unique back lit building signs finishes the building off to accent features of the property. The site was a prime location off Holly Blvd and San Pedro Blvd and included new utilities and site development. Academy Dental has five hygiene/operatory Stations, four restorative/operatory stations, one operating room, a large doctor office with private restroom, unique check-in and check-out stations and waiting room, consult room with frosted frameless glass, laboratory and sterilization suites, imaging room, large staff lounge, restrooms, storage, and mechanical/janitor suite. Project was successfully completed in 8 months and the client has benefited from the new facility to fit their growing needs.