US Eagle Credit Union | Academy Branch

The Academy Branch is the third ground up branch that Enterprise Builders has completed for US Eagle Federal Credit Union, a continued collaborative effort with New Ground International and were designed with the intent of creating a classic design, which is being applied to new locations across their branch system.

Pueblo of Santa Ana New Traditional Building

The new traditional building on the Pueblo of Santa Ana is an 8,000 sq ft, single story traditional stucco structure with a pop-up roof in the center of the building. The building is an educational and community use center for the more than 800 tribal members that call the Pueblo of Santa Ana home. Success of project: Completed one month ahead of schedule! Successful collaboration amongst project team (owner, architect, design, subcontractors) resulting in a positive build. Exceptional aspects of project: Decorative adobe walls and traditional horno ovens. Kiva fireplaces in the community space. Piki oven design that supports baking of traditional pueblo bread made of blue corn

Nusenda Credit Union Headquarters

The Nusenda Credit Union Headquarters building was designed with a high performance glass exterior using sustainable building materials and practices that conserve resources and maximize flexibility for office layouts, all done by the architect Joe Slagle. The building will also contain a Nusenda Credit Union branch, a full commercial kitchen and a dining area. The four-story building also includes a two-level parking structure and a second-story pedestrian bridge connecting to Nusenda’s existing office and training center next door. Enterprise Builders Corporation’s professional and comprehensive approach to the construction process was always committed to providing Nusenda Credit Union with quality workmanship and innovative management techniques. In the end, the project was completed on schedule.

HUB International at Parkway Square

The HUB International Albuquerque project is a 23,000 square foot interior renovation on the fifth and seventh floors in the Two Park Square office building. The Park Square office complex has a couple Class A high-rise buildings in the Uptown area that provide ample parking, restaurants, and interstate access. The new office space is a clean, monochromatic design with warm tones and textures throughout. An open office layout was implemented to allow natural light into the entire office. This open plan concept removed the hierarchy of the traditional office dynamic and made the open office workstations seem as valuable as the private offices. The lobby tile wall and warm wood tone flooring provide a welcoming and comfortable experience while looking over the west mesa of Albuquerque.

Affordable Solar

Affordable Solar was a 28,745 square foot tenant improvement converting existing office space for new tenant multi use space to include new offices, training rooms, conference rooms, collaboration areas, research and development, business areas, break areas and updated restrooms. In addition, plumbing, mechanical and electrical systems updated. The project GMP $2,895,000 and completed under budget with savings of $95,000.00 or 3.3% to the project which included end of project credit for Segregation, PNM Energy Rebates and un-used Owner Contingency and Allowances for final cost of $2,800,00.00. The project had an aggressive schedule to meet clients’ needs for new facility and was completed in 5 months. The project was completed on time and within budgets. Project was successful in part of preconstruction services which Enterprise Builders Corporation assisted in re-programming the project in conjunction with the design team as Affordable Solar had a change in space plan during construction. In addition to early works packages, Enterprise Builders Corporation was able to identify long lead times that would have impacted to the project and successfully substituted doors and frames, control systems, plumbing and light fixtures. These items were delivered and installed to meet the opening critical path date of March 30, 2023

Lowell West Complex

Lowell West Complex is a new, 2 story facility consisting of a combination of structural steel framing and structural masonry construction along with an approximately 3-acre site development package. The facility is a new ground-up addition to Albuquerque Public Schools and was constructed just west of the existing Lowell Elementary School campus. Lowell West Complex is an inviting, highly functional and flexible facility that serves several APS programs including Transition Services, APS Community Clothing Bank, Title 1 Homeless Program, District Parent‐Teacher Association (PTA) and Community Academic Initiative Resource (CAIR), a non-APS partner. The new building supports post high school special needs students by promoting collaborative and interdisciplinary educational and training opportunities across the different departments. Students gain experience with hands-on training that empowers their capacity to be self-sufficient through entrepreneurial and work-force partnerships with local business. A Multi-Purpose room, Coffee Shop, Life Skills and training classrooms and several strategically located huddle spaces are the cornerstone of collaborative training, increased efficiency and enhanced teamwork that support the educational and working environments. The facility also addresses previously underserved departmental needs, such as new administrative offices for all departments, and a Warehouse for APS Clothing Bank and Title I the departments new main supply distribution center to servicing the entire district . A separate portion of the building is dedicated to serve younger children as part of the Title I and CAIR departments, equipped with classrooms and a lunch room. Two secured and landscaped outdoor playgrounds can be used year-round to support curricular activities and summer programs. Lowell West is a dynamic mixed‐use building that will provide a new sense of pride and dignity for the departments housed within.

First Financial Credit Union Headquarters

While serving the community for over 80 years, First Financial Credit Union (FFCU) has had to adapt alongside its members, their staff, and the ever-evolving marketplace. The main objective of this project was the creation of a new central office and a local banking branch. The leadership of First Financial had a substantial list of ideas and concepts they wanted to incorporate into this project from the outset. All desires were focused around employee health and safety, accessibility of the staff and patrons, and the need to better serve the community at large. A consolidated team effort between owner, design team, and the contractor, Enterprise Builders – this project was delivered as a design build contract. The team’s ability to work collaboratively throughout the entire design and construction process allowed for easy adaptation to client needs and wants, a major key to the project’s success. Having a budget set early and continuous pricing of design concepts and changes supported the leadership team in making durable design decisions that honored project goals.