This intricate renovation tested the walls of time, as we completed an infrastructure upgrade within the confines of the 1960’s section of the Presbyterian Main Hospital. Floor by floor, we extracted existing HVAC ducts, plumbing pipes and electrical conduits and replaced them with modern alternatives. This upgrade also integrated the modernization of all four elevator shafts on each of the levels. The multi-phased project demanded constant coordination and careful shut-down scheduling between the construction team and owners. Special attention was paid to Interim Life Safety Measures and Infectious Disease Control due the sensitive nature working within a fully operational hospital. Additionally, we performed a complete removal and renovation of the 1B unit which included 15 patient rooms with med gas hook ups, private bathrooms and a central nurse station.


Address 1100 Central Ave SE, Albuquerque, NM
Owner Presbyterian Health Care Services
Architect Dekker/Perich/Sabatini, Ltd
Users Icon
News
Article Unavailable
Hands Icon
Community
Article Unavailable
Speech Bubble Icon
Facebook
© 2017 Enterprise Builders, All Rights Reserved
505-857-0050NM Lic 29031AZ Lic ROC198276
Facebook